New / 2nd plating facility opened in 2019

  • • This brand new from the ground up facility, now in full operation.
  • • Computer-controlled for process accuracy and repeatability.
  • • Five (5), specific process lines with room for expansion.
  • • Waste Treatment System designed and built with the highest level of process capability and environmental protections.